fbpx

Modular housing decreases construction time almost to half and the overall expenses by 10 to 20 percent. A small crew of moderately skilled workers can deliver the construction task in a climate-controlled installation rather than utilizing about 22 separate trades of professions that contribute to conventional home construction, using the

The MEP design process in Los Angeles is a complicated one. It starts with a building's schematic design and ends with its construction phase. This process is composed of three phases: conceptual (design), schematic (design), and construction drawings (construction). A mechanical engineer is responsible for designing the MEP systems for