fbpx
MEP Deign Medical Center Clinic

MEP Design and Title 24 for a Medical Center Addition in El Monte, CA

At InnoDez, we are committed to providing innovative and efficient MEP design and engineering solutions for the healthcare sector. For the Medical Center Addition in El Monte, CA, we delivered comprehensive mechanical, electrical, and plumbing (MEP) engineering services while ensuring compliance with Title 24 energy efficiency standards. This project aimed to expand the medical center’s capabilities with modern facilities to support high-quality patient care and operational excellence.

Our MEP Engineering Approach:

The addition to the medical center required a meticulous approach to designing MEP systems that would meet the high standards of healthcare facilities. Our team collaborated closely with architects and project stakeholders to develop solutions that ensure reliability, efficiency, and sustainability.

Mechanical Systems:

To meet the stringent demands of a healthcare environment, we designed an HVAC system that provides precise temperature control, optimal indoor air quality, and enhanced ventilation. These systems play a crucial role in maintaining a clean and comfortable environment for patients, staff, and visitors.

Electrical Systems:

Our electrical design focused on creating a robust infrastructure that supports the advanced medical equipment, lighting, and emergency power needs of the facility. The inclusion of redundant power systems and energy-efficient lighting ensures uninterrupted operations and reduced energy consumption.

Plumbing and Fire Protection:

Reliable plumbing is essential for healthcare facilities. We incorporated efficient plumbing systems to ensure consistent water pressure, quick waste removal, and hot water availability. Additionally, we designed a fire protection system tailored to meet strict safety regulations, safeguarding the building’s occupants.

Title 24 Compliance and Energy Efficiency:

As part of our commitment to sustainability, we ensured the project adhered to Title 24 standards, California’s energy efficiency regulations. Our design focused on integrating energy-efficient technologies, including LED lighting, advanced HVAC controls, and water-saving plumbing fixtures, reducing the facility’s environmental impact while lowering operational costs.

Challenges and Innovative Solutions:

Healthcare facility additions come with unique challenges, including adhering to strict regulatory requirements and ensuring minimal disruption to ongoing operations. Our expertise in MEP design for medical centers allowed us to implement tailored solutions, such as phased construction planning and modular system designs, to address these complexities effectively.

Why Choose InnoDez for Healthcare Projects?

At InnoDez, we understand the critical nature of healthcare environments and the importance of precision in every aspect of MEP engineering. From designing systems that ensure patient comfort to meeting complex regulatory requirements, we bring unparalleled expertise and dedication to every project.

Contact Us:

Looking for reliable and innovative MEP engineering services for your healthcare project? Contact InnoDez today to learn how we can help bring your vision to life with sustainable, efficient, and code-compliant designs.

InnoDez provided MEP Design and Engineering and Title 24 for a 714 SF addition to Southern Medical Center (Clinic) at 12100 Valley Blvd El Monte CA 91732.

MEP Deign Medical Center Clinic

In the project, the client wanted to change the configuration of the hallway and the bathrooms.

A new RU has been selected based on the HAP calculation and ventilation rate of CMC Table 4A

An electric water heater with a storage capacity of 37 gallons have been selection with an expansion tank and a UEF of 0.92 to comply with the T24.

Sewer and water have been designed and isometric drawing for water and sewer has been done based on the client request.

One Panel has been selected with 100 A 3R type panel.

Short circuit Calculation has been performed and dialux calculation for emergency light has been done to make sure there is enough lux for the means of egress.

T24 including Building Envelope, Mechanical, and lighting control has been done.

Related Projects